Cut weeks off every narrative.
Storia turns scattered project records into a defensible claim narrative, linking evidence, building timelines, and structuring the claim package so your project team can move from discovery to action faster.
- Source-linked drafts
- NDA on day one
- Your team stays in control
Time to a working narrative
Typical
6–12 weeks
With Storia
7 days
Drafted from your records by the platform. Your claim team picks it up and refines.
Built for project teams
Storia helps the people closest to the work surface the records, events, and context that claims depend on.
Source-linked by design
Every narrative point connects back to the underlying evidence, so teams can verify, challenge, and refine the output.
Claims that grow with the project
Build claim support while the project is still active, instead of reconstructing the story months later.
Your records stay yours
Your project records remain yours. Storia handles them under NDA and does not use them to train shared models.
The gap
Your project already has the evidence. It just isn’t assembled.
Construction teams capture the record every day through schedules, RFIs, daily reports, photos, costs, changes, and correspondence. But when a claim appears, that record is fragmented. Teams spend weeks digging through documents, rebuilding timelines, and connecting facts to support. Storia closes the gap by turning scattered project records into claim-ready evidence, so legitimate cost does not disappear simply because the proof is too hard to assemble.
6–12 weeks
to assemble delay evidence manually
$300–500/hr
for delay and claim support
Millions
in legitimate entitlement left on the table
The scenario
From a missed RFI to a claim-ready narrative in 7 days.
A delayed RFI response created a cascading schedule impact. Within one week, Storia assembled the supporting record, quantified the exposure, and produced a working narrative for the claim team.
Case timeline
Day 1
$0
RFI submitted
No cost impact identified yet.
Day 10
$0
Response window missed
The contractual response period was exceeded, creating a potential entitlement issue.
Day 34
$1.15M
Critical-path delay identified
Idle time accumulated at approximately $48K/day, bringing the documented exposure to $1.15M.
Day 41
$1.40M
Claim narrative drafted
Storia delivered a working draft with linked source records, supporting the claim team’s review and refinement.
What your team receives after 7 days
A structured claim narrative drafted from the project record, with linked source documents and timeline evidence already assembled.
- $1.40M documented
- 7 days vs. 6–12 weeks
- ~80% assembly time saved
Narrative draft · CCD-014
Day 7
Asserted impact
$1.40M
Basis of impact
34-day critical-path delay, drafted from project records.
Evidence assembled
14
Timeline events
3
RFIs and responses
22
Daily reports linked
34 days
Schedule impact
All sources linked · ready for your claim team to refine
v1.0
Why it matters
Free your project managers to manage projects, not chase evidence.
- Reclaim the time PMs lose digging through RFIs, daily reports, meeting minutes, schedules, and emails.
- Stop choosing between staying ahead of the work and reconstructing what happened after the fact.
- Give project leaders more time for coordination, decision-making, risk management, and keeping the job moving.
The claim toolkit
Built on the capabilities your team already needs.
- ClaimDelay analysisConnect schedule updates with the records behind them. Storia helps teams see what changed, when it became known, and how it affected the critical path.
- ClaimClaim centerSubstantiate claims as the project unfolds. Storia helps teams generate claim events, organize supporting records, and build claim packages that grow, adapt, and stay current throughout the project lifecycle.
- DiscoveryScheduleSee the project timeline in context. Storia combines Gantt views, event tracking, and schedule comparisons with the documents behind each task, change, and delay.
- IntelligenceImpact mapTrace how project events connect. Storia links RFIs, site events, change orders, schedules, and communications so teams can understand cause, impact, and timeline in one view.
Claims Management
Give your project team weeks back.
Is your project facing disputes or heading toward a claim? Give Storia the project data to produce narratives with linked evidence ready for your team to review, refine, and act on.