The dispute platform

Close disputes based on facts.

Cause and effect, context and impact accross RFIs, change orders and more.

  1. Site event

    Underground utility hit during excavation

    Tagged in daily report · 2024-04-08

  2. RFI 2024-073

    Conflict between civil drawings and as-built locates

    Submitted 2024-04-09 · 14-day response

  3. Schedule update

    Critical-path slip across foundations and slab

    Update v06 · 11-day window impact

  4. Change order request

    COR 19: Owner directive needed to reroute

    Filed 2024-04-22 · Pending owner

Real traceability and reconstruction of events in minutes

The shift

The same dispute, two outcomes.

Dimension
Without Storia
With Storia
  • Time to assemble facts
    Weeks. Manual retrievement of documents.
    Minutes. Traceability and reconstruction builtin.
  • What you bring to the meeting
    Opinions and partial documentation.
    A traceable linked timeline.
  • Where it usually ends
    Delays and escalation.
    Timely resolution.

Most disputes can be resolved through clarity. The ability to trace and reconstruct allows for speedy resolutions.

  • Resolve scope and coordination issues.
  • Reduce manual manpower effort.
  • Fact based decisions.

Dispute Resolution

Bring proof to the next coordination meeting.

Book a demo
Dispute Resolution · Storia · Storia